Free Shipping on orders over $149. Use coupon code: FREESHIPPING *Restrictions apply
Call us: (786) 452-6565 | Today's customer service hours: 8:00am-5:00pm EST
×

Ironwear Safety, 8′ Dual SRL Leading Edge

$509.99$519.99

8′ Long Leading Edge Dual SRL with Galvanized Steel Cable, 360 Fully Rotating Steel Rebar Hook, ANSI Z.59.14-2014

Set
Aluminum Rebar Hook

$519.99

Steel Rebar Hook

$509.99

Ironwear Safety, 8′ Dual SRL Leading Edge

$509.99$519.99

In stock Free Shipping Eligible on over $149
8' Long Leading Edge Dual SRL with Galvanized Steel Cable, 360 Fully Rotating Steel Rebar Hook, ANSI Z.59.14-2014
  • Leading Edge
  • Aluminum Rebar Hook
  • 360° Rotating
  • Included Connectors
  • 8 ft Dual Cable Leading Edge SRL with an aluminum rebar hook that is 360° rotating and has a 3,600 lb gate strength. Connectors included
  • Class A, Meets ANSI Z359.14-2014, along with OSHA 1910.502 and OSHA 1926.66
  • Capacity range of 130 - 310 lbs during LE use, and 130 - 420 lbs when not
  • Average arresting force of 1,350lbs with a maximum of 1,800lbs
  • Max arresting distance of 54 - 102 in during LE use, and 24 in when not
  • Minimum fall clearance of 17 - 21 in during LE use, and a Max free fall of 5 ft when not

Only logged in customers who have purchased this product may leave a review.

  • Item#: 2408D
Order Size Discount% Free Shipping
$500 - $1999 3%
$2000 - $3999 5%
$4000 plus 7%

Item Attributes

  • Style 2408D-ARH-LE
  • Brand Ironwear
  • Ansi Rating ANSI Z359.14-2014